PROJECTS HANDLED BY ECCS AND PROFESSIONALS

Sr. # Sector / Project Client Location Project Duration

INTERNATIONAL PROJECTS

1 Environmental & Social Management Framework Preparation for Energy Efficiency Sub-Project of On-Farm Water Management Operations USAID Afghanistan Jun to Aug 2012
2 Environment and Sustainable Management of Natural Resources including Energy –  Task 2 European Union Istanbul, Turkey Feb-March 2006
3 Environment and Sustainable Management of Natural Resources including Energy –  Task 1 European Union Madrid, Spain Feb-March 2006
4 Environmental Assessment of Wind Farms (Ostrava, Czech Republic) European Union Istanbul, Turkey Aug-Sep  2006
5 Genetically Modified Crops for Livestock (Testing of various nutritional regimens based on grain meals for goats) (Langston University, Oklahoma, USA)  USDA Oklahoma, USA Feb 2001 to Jan 2002
6 Forest Carbon Stock Measurement Project  – Task 2 NORAD India / Nepal April 2006
7 Forest Carbon Stock Measurement Project – Task 1 NORAD India / Nepal Nov 1997 to Jan 1998
8 Environmental Aspects of Growing Soybean in Asiatic Region (Dubai, UAE) ASA Dubai, UAE Dec 1996 to Feb 1997
9 Environmental Impact of Irradiation Techniques in Agriculture and Food Safety (Free University, Berlin, Germany) FAO/UNDP Berlin, Germany 1989 & 1998
10 Nuclear Techniques in Agriculture (UN City, Vienna, Austria) FAO/UNDP UN City, Vienna, Austria 1989 & 1998
11 Environmental Impact of the use of Irradiation Techniques to improve degradation of complex carbohydrates Warsaw Agricultural University Poland Jan-Jun 1989
12 Farm Animals and the Environment – Task 2 (Royal Veterinary & Agricultural University,  (Foulum Campus), Denmark) EAAP & ESNA Denmark Jan1990 to Oct 1992
13 Farm Animals and the Environment – Task 1 (Warsaw Agriculture University, Warsaw, Poland) EAAP & ESNA Poland Jan1990 to Oct 1992
14 In-situ Techniques in Agriculture (University of Wagningen, The Netherlands) EAAP & ESNA Netherlands Jan1990 to Oct 1992

NATIONAL PROJECTS

A.  SOCIO-ENVIRONMENT / CLIMATE CHANGE (SE/CC)

1.     ENVIRONMENTAL ASSESSMENT OF HIGHWAYS / MASS TRANSIT PROJECTS

1 Third Party Evaluation of Murree Biodiversity Park (MBP), Murree EPA, Punjab Murree Aug to Oct 2014
2 Pre-Proposal Environment Assessment of KLM, Lahore to Abdul-Hakim Section (230Km) NHA Lahore to Abdul-hakim 0.5 M
3 Pre-proposal Environment Assessment of KLM, Multan to Sukkur Section (400Km) NHA Multan to Sukkur 0.5 M
4 EIA of Installation of Cable Car in Murree from TDCP Bostal More to Pindi Point TDCP Murree 1.25MM
5 EIA of Installation of Cable Cars in Murree from old Murree to Pindi Point TDCP Murree 1.1 MM
6 EIA of Installation of Cable Cars in Murree from Musayri to Old Comm. Camp TDCP Musayri to Old Commissio-ner Camp 1.1 MM
7 EIA of Installation of Cable Cars in Murree From Lower Topa to Kashmir Point TDCP Murree October 2014
8 Revised EIA of Elevated Expressway (EEW) Project from Main Boulevard Gulberg/Jail Road to Motorway M2 LDA Lahore Sep 2015 to Dec 2015
9 EIA of Elevated Expressway from Main Boulevard Gulberg to Motorway M2, Lahore LDA Lahore Sep, 2015
10 EIA of  EEW along with Metro Bus Service from Zafar Ali Road/Main Boulevard Gulberg to Ring Road/Motorway M2, Lahore LDA Lahore Aug to Dec 2014
11 EIA of Dualization of Roads from LOS Ferozepur Road to Multan Road TEPA, LDA Lahore Jan to May 2014
12 IEE of Reengineering and Realignment of Jail Road Underpass, Lahore TEPA, LDA Lahore Sep 2013 to Jan 2014
13 Implementation of Environment Management Plan (EMP) of M4 (Khanewal to Multan Motorway) Project NHA Lahore Sep 2012 to Aug 2013
14 Update Resettlement Action Plan (RAP) of Sehwan-Rattodro Road Project (N-55) NHA Sehwan-Rattodro Sep 2012 to Aug 2013
15 Construction / Widening of Kashmir Highway, Islamabad CDA Islamabad Mar 2007 to Dec 2011 & Jan 2013

2.     CLEAN DEVELOPMENT MECHANISM (CDM) PROJECT

16 Public Consultation for Clean Development Mechanism for 100 MW of QASP, Bahawalpur QASP Bahawalpur Feb to Mar 2015
17 Stakeholder Engagement Session of Clean Development Mechanism (CDM) and Environmental Assessment (EA) for Khadim-e-Punjab Ujala Program. Energy Department Punjab 11 Districts of South Punjab Feb to March 2018

3.     ENVIRONMENTAL ASSESSMENT OF COAL POWER PROJECT

3 EIA for the Construction of 216 MW coal fired power plant, Khairpur Tamewali, District Bahawalpur CMEC Bahawalpur 4MM

4.     ENVIRONMENTAL ASSESSMENT OF MIXED ENERGY PROJECTS

4 IEE of Energy Solution Using Indigenous Resources In Villages for Chak 443/GB (Village 1), Faisalabad Energy Department Punjab Faisalabad 2MM
5 IEE of Energy Solution Using Indigenous Resources In Villages for Chak 563 /EB (Village 2), Vehari Energy Department Punjab Vehari 2MM

5.     ENVIRONMENTAL ASSESSMENT OF AFFORESTATION

6 Strategic Environmental Study of Afforestation 187 Lots in Southern Punjab SPFC Southern Punjab 6MM

6.     ENVIRONMENTAL ASSESSMENT OF SOLAR POWER PROJECTS

7 IEE of 30MW Solar Power PV Project Noorsar, Chishtian, Bahawalnagar Asia Petroleum, Karachi Bahawal-nagar 3MM
8 IEE of QA Solar Park for 100 MW Solar Photovoltaic Project (Block C), Chishtian, Bahawalnagar MdeCC – Solution de Energy, Bahawal-nagar 1MM
9 IEE of QA Solar Park for 100 MW Solar Photovoltaic Project (Block A), Chishtian Bahawalnagar Storm Harbor, USA Bahawal-nagar 1MM
10 IEE Topographical Survey and Geo-technical Investigations for 50MW Solar PV project near Karachi TBEA, China Karachi 4MM
11 Supervision Consultancy for Operational phase of QASP for 100MW Solar Poject (Block E+F) Zonergy, China Bahawalpur Sep 2016
12 Supervision Consultancy for Operational phase of  QASP for 100MW Solar PV Project (Block C+D) Zonergy, China Bahawalpur Aug 2016
13 Supervision Consultancy for Operational phase of  QASP for 100MW Solar PV Project (Block A+B) Zonergy, China Bahawalpur July 2016
14 IEE of 24 MW Solar Power Plant, Faisalabad WASA Faisalabad Chokera, Faisalabad March to June, 2015
15 IEE for 50 MW Solar  Power Project at Chakwal Siddique Sons (Pvt.) Ltd Chakwal July 2015
16 IEE of QA Solar Park Bahawalpur for 100 MW Solar PV Project (Block U5+U6) Zonergy, China Bahawalpur March to June 2015
17 IEE of QA Solar Park Bahawalpur for 100 MW Solar PV Project (Block U3 + U4) Zonergy, China Bahawalpur March to June 2015
18 IEE of QA Solar Park Bahawalpur for 100 MW Solar PV Project  (Block U1 + U2) Zonergy, China Bahawalpur March to June 2015
19 IEE of QA Solar Park Bahawalpur for 100 MW Solar PV Project (Block R + T) Zonergy, China Bahawalpur March to June 2015
20 IEE of QA Solar Park Bahawalpur for 100 MW Solar PV Project (Block Q + S ) Zonergy, China Bahawalpur March to June 2015
21 IEE of QA Solar Park Bahawalpur for 100 MW Solar PV Project (Block N + P) Zonergy, China Bahawalpur March to June 2015
22 IEE of QA Solar Park Bahawalpur for 100 MW Solar PV Project  (Block G + J) Solution de Energy Bahawalpur March to June 2015
23 IEE of QA Solar Park Bahawalpur for 100 MW Solar PV Project Block (H + K) Storm Harbour Company Bahawalpur March to June 2015
24 IEE of QA Solar Park Bahawalpur for 100 MW Solar PV Project (Block E + F) Zonergy, China Bahawalpur March to June 2015
25 IEE of QA Solar Park Bahawalpur for 100 MW Solar PV Project (Block C + D) Zonergy, China Bahawalpur March to June 2015
26 IEE of QA Solar Park Bahawalpur for 100 MW Solar PV Project (Block A+B) Zonergy, China Bahawalpur March to June 2015
27 EIA of 1000 MW Quaid-e-Azam Solar Park, Cholistan, Bahawalpur Energy Department Punjab Bahawalpur Sep to Nov 2014
28 IEE of 100 MW Solar Photovoltaic Project, QASP  Bahawalpur Energy Department Punjab Bahawalpur May to Aug 2014
29 Training of Professionals for Environmental Monitoring for 300MW Solar PV Plant, Bahawalpur Zonergy, China Bahawalpur Aug to Sep 2016

7.     ENVIRONMENTAL ASSESSMENT OF HYDRO-POWER PROJECTS

30 EIA of Gehrait-Swirlusht  Hydropower Project Irrigation Department Peshawar Chitral Sep 2012-Aug 2013
31 IEE of Istaru-Booni Hydropower Project Irrigation Department Peshawar Chitral Sep 2012-Aug 2013
32 Detail Design of Dasu Hydropower Project (Sub-Component B4 of WCAP, WB) Irrigation Department Kohistan Jan to May 2012
33 Feasibility Study of Small Hydropower Stations in Punjab – Task2 Lahore Aug-Oct 2011
34 Feasibility Studies of Small Hydropower Stations in Punjab – Task-1 Lahore Oct-Dec 2010
35 Due Diligence of EIA 2005 of Kotli Hydropower Project Lahore Jan-Apr 2011
36 Updating of EIA 1996 of Neelum-Jhelum Hydropower Project Lahore Jan-Sep 2010

8.     ENVIRONMENTAL ASSESSMENT OF WASTE MANAGEMENT PROJECTS

51 EIA of SW Transfer Station & Recycling of C&D Waste at Thokar Niaz Baig, Lahore LWMC Lahore Nov 2015 to Feb 2016
52 EIA of Solid Waste Landfill Site at Bhinda Dakhli, Bahawalpur      BWMC Bahawalpur Sep to Dec 2015
53 Chitral Solid Waste Management System (SWMS) Development CIADP Chitral Aug 2013 to Feb 2014
54 Baluchistan Effluent Disposal into Right Bank Outfall Drain Section III (RBOD-III) Project Baluchistan Feb 2006 to Apr 2006
55 Establishment of Sewage Water Treatment System at Industrial Area, Chunian Chunian May 2005 to Jun 2005
56 EIA of Incinerator/Waste Management System with Scrubber, Kharianwala, Sheikhupura Mediland, Lahore Sheikhupura 2MM
57 IEE of Amanat Ullah (Scrap Handling) Company, Khanewal M/S Amanat Ullah Khanewal
58 IEE of Amanat Ullah (Scrap Handling) Company, Sheikhupura M/S Amanat Ullah Sheikhupura

1.     ENVIRONMENTAL ASSESSMENT OF THERMAL POWER PROJECTS

59 ESIA of 220MW Coal Fired Thermal Power Plant at Khairpur Tamewali, Bahawalpur Bahawalpur 4 MM
60 ESIA of 216 MW Thermal Power Generation for Quaid- E- Azam Apparel Park, Sheikhupura PIEDMC Sheikhu-pura April 2016 to July 2016
62 EIA of Pakistan Pind Daden Khan 300 MW Coal Fired Power Plant CMEC Pind Dadan Khan Nov 2014 to Mar 2015
63 EIA of Industrial Coal Mining in Salt Range, Punjab CMEC Kallar Kahar, Chakwal July 2015 to October 2015
64 Feasibility Study of 215-km Thar-Matyari HVAC Transmission Line of Coal Based Power Plant, Task-2 Lahore Oct-Dec 2011
  65 Feasibility Study of 985-km Thar-Lahore HVDC Transmission Line of Coal Based Power Plant Task-1 Lahore

2.     ENVIRONMENTAL ASSESSMENT OF WATER MANAGEMENT PROJECTS

66 Aquatic Study of Manchar Lake, Sindh Manchar Lake, Sindh Pakistan Dec 2008-Feb 2009
67 Preparation of Resettlement Action Plan (RAP), Nai Gaj Dam World Bank Dadu Sep-Nov 2008
68 Construction of New Khanki Barrage, PC-1 Updates
69 Monitoring & Evaluation of Resettlement Plans of Lower Bari Doab Canal (LBDC) Implementation Project Jan-May 2012
70 Taunsa Barrage Emergency Rehabilitation and Modernization Project (TBERMP) Task 1 Lahore Apr-May 2007
71 Updating the Feasibility Report of Tank Zam Dam Aug 2006 to Oct 2006
72 Kharian Irrigation Canal Project (KICP) at Upper Jhelum Canal May 2006 to July 2006
73 National Drainage Program (NDP) – Lining of Irrigations Channels, Baluchistan Baluchistan Jun 2005 to Aug 2005
74 Environment Impact Assessment of Upper Jhelum Canal Nov 2004 to Jan 2005

3.     ENVIRONMENTAL ASSESSMENT OF URBAN DEVELOPMENT PROJECTS

75 IEE of Salt’n Pepper Restaurant, Bahawalpur Mr. Nauman Bahawalpur 2MM
76 IEE of City Café & Grill, Bahawalpur Mr. Salman Akram Ch. Bahawalpur 1MM
77 IEE of Commercial Building City Mall, Bahawalpur Mr. Tanveer Sohail Bahawalpur 2MM
78 IEE of Commercial Building Guezzated officers colony, Bahawalpur Mr. Kazim Hussain Bahawalpur 2MM
79 IEE of Malik Surgimed Hospital, Bahawalpur Mrs. Sajida Parveen Bahawalpur 2MM
80 IEE of Khayaban-e-Arshad Housing Scheme, RYK M. Arshad Rahim Yar Khan 2MM
81 IEE of Saif and Arif City, Okara Saif Ullah Okara 2MM
82 IEE of Sattar Garden Housing Scheme, Khanewal M. Arshad Khanewal 2MM
83 IEE of Umar Society, Okara Mr. Anwer Okara 2MM
84 Pre-Feasibility study of 14 Development Schemes in Gawadar Govt. of Oman Gawadar Sep 2005 Nov 2005
85 Formulation of Punjab Sustainable Development Strategy PHA Foundation Islamabad Apr-May 2007
86 EIA of Multistorey apartments at sector I-16/3, Islamabad PHA Foundation Islamabad 3MM
87 EIA of Housing Scheme at Kurri Road, Islamabad PHA Foundation Islamabad   3MM
88 EIA of Multistorey apartments at sector I-12, Islamabad PHA Foundation Islamabad 3MM
89 IEE of Multistorey apartments at sector G-10/2 & G11/4, Islamabad PHA Foundation Islamabad 3MM
90 Gulshan-e-Wahab Housing Scheme Abdul Rehman Khanewal 2MM
91 Sadiq Gardens, Okara Mr. Khalid Okara 2MM
Subhan City Housing Scheme Mr. Nadeem Sahiwal
Green View Housing Scheme Mr. Nadeem Pakpatan
Fazal Villas Mr. Nadeem Bahawalnagar

4.     ENVIRONMENTAL ASSESSMENT OF INDUSTRIAL PROJECTS

93 EIA of Welcome Agro-Chemical Granular Formulation Plant, Bahawalpur M. Azam Bahawalpur 3MM
IEE of Bukhsh Ellahi & Sons (ice-cream stick) Manufacturing Company, Faisalabad M/S Bukhsh Ellahi Faisalabad 1MM
95 IEE of Shahzaib Gas (Pvt.) Ltd. Bahawalpur Mr. Basheer Bahawalpur 1MM
96 IEE of Muhammadi Cold Store, Bahawalpur Mr. M Shahzad Bahawalpur 1MM
97 IEE of Waqas Industries (Oil Mills), Bahawalpur Mr. Waqas Bahawalpur 1MM
98 IEE of Umar Poultry Farm, Bahawalpur M. Arshad Bahawalpur 1 MM
99 IEE of Bilal Oil Mills, Bahawalpur M. Arif Bahawalpur 1MM
IEE of Pak Rice Mill Ahmad Pur Amir Mumtaz Bahawalpur
100 IEE of Welcome Oil Company, Bahawalpur M. Azam Bahawalpur 1MM
101 IEE of Allah-o-Akbar Protein Farm, Bahawalpur M. Ahmer Bahawalpur 1MM
102 IEE of Lodhi Protein Farm (Control Shed), Lodhran, M Salman Khan Lodhi Lodhran 1MM
103 IEE of Madina Protein Farm (Control Shed), Bahawalpur Waqas Malik Bahawalpur 1MM
104 IEE of Khawaja Poultries, Bahawalpur Irfan Shoukat Bahawalpur 1MM
105 IEE of Malik Proteins (Control Shed),  Bahawalpur Arshad Sharif Bahawalpur 1MM
106 IEE of Amin Protein Farm (Control Shed), Bahawalpur Mr. Amin Akbar Sheikh Bahawalpur 1MM
107 IEE of Choudhary Control Shed, Vehari Mr. Riaz Shareef Vehari 1MM
108 IEE of Qandhari Protein Farm, Vehari Abdul Jabbar Vehari 1MM
109 IEE of Malik Control Shed, Layyah Mr. Tariq Layyah 1MM
110 IEE of Umar Protein Farm, Muzaffargarh M. Ishaq Muzaffargarh 1MM
111 IEE of Global Protein Farm, Muzaffargarh Mr. Qadir Bukhsh Muzaffargarh 1MM
112 IEE of Pak Rice Mill Ahmad Pur, Bahawalpur Mr. Amir Mumtaz Bahawalpur 1MM
113 IEE of Shahid & Brothers Rice Mill Bahawalnagar Shuja ud Din Bahawal-nagar 1MM
114 IEE of Usman Poultry Farm, Vehari Abdul Jabbar Vehari 1MM
115 IEE of Gujjar Poultry Farm, Pakpattan Mr. Sultan Akbar Pakpattan 1MM
117 Adam Cotton Industry Bahawalpur Talib Hussain Bahawalpur
118 M/S Salsabil Rice & Processing Mills, BWP Ameen Peer Bahawalpur
119 M/S Shahid Waqas Flour and General Mills Ghulam Kiberya Rahim Yar Khan
120 Momin Protien Farm, BWP M. rfan Sarwar Bahawalpur
121 Al-Haseeb Protien Farm M. Naveed Hayat Bahawalpur
122 Roshan Shed Ahsan Bahawalpur
123 Al-Hamd Oil Mills, Bahawalpur Bahawalpur
124 GM Cables Mr. Shahzad Lahore
125 Great Man Multi Products Mr. Shahzad Lahore
126 Noor Pipe Industries Mr. Asif Lahore
127 Fort Energy (Pvt.) Mr. Arif Bahawal-nagar
128 EIA Coal Mining M. Asif Khushab
129 Shale Gas LPG Rao Haroon Rahim Yar Khan
130 Maxim International Anwaar Khanewal
131 Nasir Khursheed Packages Mr. Aqeel Sheikhupura
132 Al-Wasi Poultry Farm Mr. Sarmad Okara
133 Al barkat Proten Farm M. Mahmood Pakpatan
134 Chaudhary Control Shed Layyah Riaz Shareef Layyah
135 Bhalli and Sons Asphalt Plant Mr. javed Sheikhupura
136 Alhammdali Petroleum Storage Mr. Qasim Rajanpur
137 Azizi Textile, Dyeing Mr. Irfan Faisalabad
138 Al-Khaleej Lubricants Mr. Khalid Sheikhupura
139 Zain- ul-Abideen Cotton Industry Sheikhupura

5.     ENVIRONMENTAL ASSESSMENT OF MINING LEASES

140 IEE of Golewali Mining Lease-1, Quaidabad PUNJMIN Quaidabad 1MM
141 IEE of Golewali Mining Lease-2, Quaidabad PUNJMIN Quaidabad 1MM
142 IEE of Golewali Mining Lease-3, Quaidabad PUNJMIN Quaidabad 1MM
143 IEE of Mining Lease for Ordinary Sand, Qaboola Zone + City Zone 2, Arifwala, Pakpattan Mr. Hamza Shahid Pakpattan 1MM
144 IEE of Marmandi Mining Lease, Quaidabad PUNJMIN Quaidabad 1MM
145 IEE of Kupper Mining Lease, Khewra PUNJMIN Khewra 1MM
146 IEE of Jutana Mining Lease-1, Khewra PUNJMIN Khewra 1MM
147 IEE of Jutana Mining Lease-2, Khewra PUNJMIN Khewra 1MM
148 IEE of Waralah Mining Lease, Khewra PUNJMIN Khewra 1MM
149 IEE of Mian Mitha Mining Lease, Khushab PUNJMIN Khushab 1MM
150 IEE of Chambal Mining Lease, Khushab PUNJMIN Khushab 1MM
151 IEE of Katha Mining Lease, Khushab PUNJMIN Khushab 1MM
152 IEE of Waula Mining Lease, Dandot PUNJMIN Dandot 1MM
153 IEE of Dandot Mining Lease, Dandot PUNJMIN Dandot 1MM
154 Aziz Rock Salt Mining 1MM
155 Coal Mining M. Asif Khushab 1MM

6.     THIRD PARTY VALIDATION (TPV)

157 Third Party Validation of Khadam-E-Punjab Rural Road Program CNW Department Punjab 1MM
158 Baseline study of Aquatic and Terrestrial Ecology of Taunsa Wildlife Sanctuary (Ramsar Site), Task 2 Taunsa, Muzafar-garh Jun-Jul 2007

7.     ENVIRONMENTAL QUALITY ASSURANCE PROJECTS

159 Quality Assurance of the EIA of Kachhi Canal Project Lahore May-Jul 2008

8.     ENVIRONMENTAL AUDIT PROJECTS

160 Social and Environmental Audit of the Project by External Environment Auditor,   Task 5 Irrigation Depart.  Punjab Muzafar-garh Mar 2007 to Dec 2011 & Jan 2013

9.     SAFE & SECURE CITIES

161 Budgeting of Socio-Economic Survey of Punjab Police Integrated Command and Control Centre (PPIC3) Pipeline Project Punjab Safe City Authority 3MM

10.   ENVIRONMENTAL MONITORING

162 Laboratory Monitoring of Environmental Parameters for EEW Project LDA
163 Laboratory Monitoring of Environmental Parameters for QASP Bahawalpur
164 Laboratory Monitoring of Environmental Parameters for Ghauri Tyres Chief Minister’s Inspection Team Lahore
165 Laboratory Monitoring of Environmental Parameters for PPIC3 Punjab Safe City Authority Lahore
166 Air Dispersion Modelling

11.   RESEARCH PROJECT

167 Extent of Arsenic Contamination & its Impacts on Food Chain & Human Health in Lahore McGill University, Canada Lahore 4MM
168 Extent of Fecal Coliform Contamination & its Impacts on Food Chain & Human Health in Lahore McGill University, Canada Lahore 1MM
 

MM: Man Month, CMEC: China Machinery Engineering Corporation, EPA: Environment Protection Agency, LDA: Lahore Development Authority, TDCP: Tourism Development Corporation Pakistan, NHA: National Highway Authority, PIEDMC: Punjab Industrial Estate Development Corporation, LWMC: Lahore Waste Management Company, QASP: Quaid-e-Azam Solar Power, BWMC: Bahawalpur Waste Management Company, CMIT: Chief Minister Inspection Team, CIADP: Chitral Integrated Area Development Program, SPFC: South Punjab Forest Company